With the successful handling of several projects and a countable service in the field of Construction, KAYNAAZ is having a well experienced team of Administrators, Engineers, Foremen, Technicians and Skilled Workmen able to handle any type of Projects at any circumstances. Having sufficient tools in hand and can arrange any tools and tackles on demand the mobilization consumes minimum time as far as we are concerned.

1. Fabrication, Erection and Pressure testing and commissioning of WCS, Utility system equipments and pipelines for HSM-2

Project Image

Client : JSW Steel Ltd, Bellary, Karnataka State, India.

Work Order Value : Rs. 3.95 Crore

Fabricated and Erected : Hydraulic, Gas, Water and Media Piping

Erection of Equipments : Pumps, Duplex filters, Heat Exchangers and Valves

Major Quantity : 228000 Inch Mtr.

Job Details : Radiography testing in welding joints.

Major Points : This work was commissioned in 6.5 Months without any accidents or injuries on site.


2. Fabrication, Erection and Pressure testing and commissioning of water and air piping for Dry fog and Yard Sprinkler in RMHS 5MT.

Project Image

Client : JSW Steel Ltd, Bellary, Karnataka State, India.

Work Order Value : Rs. 4.0 Crore

Fabricated and Erected : Air and Water Piping

Erection of Equipments : Pumps, Duplex filters, Heat Exchangers and Valves

Major Quantity : 265000 Inch Mtr

Job Details : Radiography testing in welding joints.

Major Points : This work was commissioned in 7.5 Months without any accidents or injuries in site.


3. Fabrication, Erection and Pressure testing and commissioning of Utility and Tunnel Piping in SMS#1.

Project Image

Client : JSW Steel Ltd, Bellary, Karnataka State, India.

Work Order Value : Rs. 3.0 Crore

Fabricated and Erected : Air and Water Piping

Erection of Equipments : Pumps, Duplex filters, Heat Exchangers and Valves

Major Quantity : 250000 Inch Mtr

Job Details : Ultrasonic testing in welding joints.

Major Points : This work was commissioned in 7.5 Months without any accidents or injuries in site.


4. Fabrication, erection and Alignment of De-dusting Systems in BF-5 , including bag filter, chimney, and ducting.

Project Image

Client : JSW Steel Ltd, Bellary, Karnataka State, India.

No of Dedusting Systems : 7

Work Order Value : Rs. 2.2 Crore

Fabricated and Erected : Ducts, Structures, Chimney, Funnels, Transisition Pieces Hoods etc

Erection of Equipments : Screw conveyors, scraper conveyors, ID fan, Hoppers, Bag Filters, Filter Bags with cages, valves, Damper

Major Quantity : 1450 Metric Ton.

Major Points : This work was commissioned in 6.5 Months without any accidents or injuries in site.


5. Fabrication, erection and Alignment of De-dusting Systems in RMHS WT, including bag filter, chimney, and ducting.

Project Image

Client : JSW Steel Ltd, Bellary, Karnataka State, India.

No of Dedusting Systems : 7

Work Order Value : Rs. 1.25 Crore

Fabricated and Erected : Ducts, Structures, Chimney, Funnels, Transisition Pieces Hoods etc

Erection of Equipments : Screw conveyors, scraper conveyors, ID fan, Hoppers, Bag Filters, Filter Bags with cages, valves, Damper

Major Quantity : 1200 Metric Ton.

Major Points : This work was commissioned in 5.5 Months without any accidents or injuries in site.


6.Fabrication. Erection, Pressure testing and commissioning of Utility and Tunnel Piping in SMS#2.

Project Image

Client : JSW Steel Ltd, Bellary, Karnataka State, India.

Work Order Value : Rs. 1.2 Crore

Fabricated and Erected : Gas, Water and Air line Piping

Erection of Equipments : Pumps, Duplex filters, Heat Exchangers and Valves

Major Quantity : 80000 Inch Mtr

Job Details : Radiography testing in welding joints.

Major Points : This work was commissioned in 7 Months without any accidents or injuries in site.